Isolations comprise full isolation of services back to the incoming distribution network operators intake positions. These should be conducted prior to disconnections taking place.
As part of our isolation service, we carry out a “sweep and clear” where we systematically check all areas verifying the isolations being carried out. With these systems reduced we have a clear global picture of all services within the site footprint.
By carrying out the works in this manner we gain a full understanding of the supplies present on site and can make recommendations in respect to the number of disconnections required.
The isolation of the internal systems of the buildings prior to disconnection will mean that strip out and enabling works can be carried out whilst waiting for the disconnections, which can take months to complete.
Disconnections are provided by the local Distribution Network Operators (DNO), whether this is electric, gas, water or telecoms. The relevant network operator will carry out their disconnections external to the site footprint and provide a disconnection or site clear certificate.
The disconnection or site clear certificate will always state that the disconnection is a single point disconnection. There is always a possibility that cables and other apparatus may still be present and “LIVE”. It is the responsibility of the customer to verify that there are no additional supplies entering the property and we ensure that this is facilitated.